Service timetable
23:10 Leeds F.l.t. to London Gateway Frghtliner
Tuesday 6 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1600
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Leeds F.l.t. | 23:10 | 00:03 | +53 min | |||
| Doncaster | 1 | 00:05 | 00:07 | 01:42 | 01:42 | +95 min |
| Doncaster Sig D254 | 00:12 | 00:32 | 01:47 | 02:07 | +95 min | |
| Peterborough | 1 | 02:28 | 02:31½ | 03:31 | 03:34½ | +63 min |
| Alexandra Palace | 1 | 04:03½ | 04:05 | 03:35 | 03:50 | -15 min |
| London Gateway Port Lg11 | 05:10 | 05:12 | 05:10 | 05:14 | +2 min | |
| London Gateway Arrival | 05:15 | 05:17 | 05:17 | 05:19 | +2 min | |
| London Gateway Frghtliner | 05:20 | 05:22 | +2 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.