Service timetable
23:11 Tunstead Sidings (Fhh) to Trowse Yard
Tuesday 6 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 2000
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Tunstead Sidings (Fhh) | 23:11 | |||||
| Dore South Junction | 00:08½ | 00:11 | ||||
| Toton Centre Junction | 01:06½ | 01:16 | ||||
| Melton Mowbray | 02:08 | 02:13 | ||||
| Melton Mowbray Up Loop | 02:19 | 02:47 | ||||
| Peterborough | 6 | 03:41½ | 03:46½ | |||
| March Up R.s. | 04:14 | 04:49 | ||||
| Ely North Junction | 05:18 | 05:27 | ||||
| Trowse Yard | 06:42 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.