Detailed timetable

04:38 Letchworth C.s.d to Royston

Wednesday 7 October 2026

Live map
Headcode: 5R03Headcode5R03 OperatorGreat Northern UIDC20229

Planned service information

Power type
Electric multiple unit
Timing load / planned train type
700
Maximum speed
100 mph
Operating characteristics
D
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Letchworth C.s.d04:38 04:38 On time
Letchworth Cs Reception04:4804:48 04:48 04:48 On time
Baldock2pass04:51 04:48 -3 min
Royston204:59 04:58 -1 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.