Service timetable
04:30 Cambridge Reception Sidings to Cambridge
Wednesday 7 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Cambridge Reception Sidings | 04:30 | 04:21 | -9 min | |||
| Coldham Lane Dg Loop | 04:35 | 04:45 | 04:26 | 04:45 | On time | |
| Cambridge | 7 | 04:48 | 04:40 | -8 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.