Service timetable
06:39 Etches Park Sidings to Beeston Sidings
Wednesday 7 October 2026
Planned service information
- Power type
- Diesel multiple unit
- Timing load / planned train type
- 810
- Maximum speed
- 125 mph
- Operating characteristics
- Q
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Etches Park Sidings | 06:39 | |||||
| Derby | 06:41½ | 06:49 | ||||
| Long Eaton | 06:57½ | 07:02 | ||||
| Down Trent Loop | 07:06½ | 07:14 | ||||
| Beeston Sidings | 07:25 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.