Detailed timetable
13:07 Bath Spa to Bristol East Depot
Wednesday 7 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 455
- Maximum speed
- 75 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Bath Spa | 1 | 13:07 | ||||
| Bristol East Depot | 13:20 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.