Service timetable
05:16 Hope (Earles Sidings) Fhh to Maltby Colliery (Flhh)
Wednesday 7 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 800
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Hope (Earles Sidings) Fhh | 05:16 | |||||
| Sheffield Signal S81 | 05:42 | 06:05½ | ||||
| Swinton (South Yorks) | 06:31½ | 06:33 | ||||
| Doncaster Down Decoy Hhr | 06:52 | 06:58½ | ||||
| Maltby Colliery S B | PL | 07:15½ | 07:18 | |||
| Maltby Colliery (Flhh) | 07:23 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.