Detailed timetable
07:22 Kineton Mod GB Railfreight to Ashchurch Mod GB Railfreight
Wednesday 7 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 800
- Maximum speed
- 60 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Kineton Mod GB Railfreight | 07:22 | |||||
| Fenny Compton Exchnge Sidings | 07:37 | 07:47 | ||||
| Fenny Compton | DGL | 07:50 | 08:10 | |||
| Leamington Spa | DM | pass | 08:24 | |||
| Budbrook Junction | pass | 08:32½ | ||||
| Hatton Down Goods Loop | 08:38½ | 09:14½ | ||||
| Hatton (Warks) | 2 | pass | 09:17½ | |||
| Dorridge | 2 | pass | 09:28½ | |||
| Bentley Heath Crossing | pass | 09:29½ | ||||
| Tyseley | 4 | pass | 09:40½ | |||
| Small Heath South Junction | pass | 09:43 | ||||
| Birmingham Moor Street | 2 | pass | 09:50 | |||
| Birmingham Snow Hill | 1 | 09:52½ | 09:54½ | |||
| Jewellery Quarter | 1 | pass | 09:57 | |||
| Smethwick Galton Bridge High Level | 1 | pass | 10:02 | |||
| Smethwick Junction | pass | 10:02½ | ||||
| Rowley Regis | pass | 10:07 | ||||
| Stourbridge Junction | 3 | pass | 10:21 | |||
| Blakedown | pass | 10:26 | ||||
| Kidderminster | 2 | pass | 10:34 | |||
| Hartlebury | pass | 10:38 | ||||
| Droitwich Spa | pass | 10:45 | ||||
| Droitwich Spa Signal 68 | pass | 10:49 | ||||
| Worcester Tunnel Junction | pass | 10:53½ | ||||
| Worcs Shrub Hill Sig 59 | 10:59 | 11:08 | ||||
| Worcester Wylds Lane Junction | UM | pass | 11:09 | |||
| Norton Junction | pass | 11:15½ | ||||
| Abbotswood Junction | pass | 11:17 | ||||
| Ashchurch for Tewkesbury | 2 | 11:33 | 11:35 | |||
| Ashchurch Signal G453 | 11:39 | 11:41 | ||||
| Ashchurch Mod GB Railfreight | 11:46 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.