Service timetable
14:30 Tuebrook Sidings GB Railfreight to Doncaster Down Decoy GB Railfreight
Wednesday 7 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 600
- Maximum speed
- 60 mph
- Operating characteristics
- Q
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Tuebrook Sidings GB Railfreight | 14:30 | |||||
| Eccles | 15:06½ | 15:12½ | ||||
| Hemsworth Loop | 16:51 | 17:00½ | ||||
| Doncaster Down Decoy GB Railfreight | 17:25 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.