Service timetable
00:45 London Gateway Db Cargo to East Mids Gateway Terminal Dbc
Wednesday 7 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1600
- Maximum speed
- 75 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| London Gateway Db Cargo | 00:45 | |||||
| London Gateway Dep Line | 00:48 | 00:50 | ||||
| Thames Haven Sig Ur882 | 00:57 | 00:57 | ||||
| Ripple Lane Signal 806 | 01:27 | 01:32½ | ||||
| Finsbury Park | 8 | 02:13 | 03:23 | |||
| Peterborough | 4 | 05:08½ | 05:12½ | |||
| Castle Donington Emdc | 06:51 | 07:25 | ||||
| East Mids Gateway Arrival | 07:35 | 07:37 | ||||
| East Mids Gateway Terminal Dbc | 07:47 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.