Service timetable
05:28 Cambridge Sidings North to Cambridge
Wednesday 7 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 755
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Cambridge Sidings North | 05:28 | 05:23 | -5 min | |||
| Cambridge | 5 | 05:35 | 05:27 | -8 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.