Service timetable
04:49 Cambridge Sidings North to Cambridge
Wednesday 7 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 755
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Cambridge Sidings North | 04:49 | 04:46 | -3 min | |||
| Cambridge | 7 | 04:56 | 04:54 | -2 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.