Detailed timetable

12:09 Barrow-in-Furness to Barrow C.s.

Thursday 8 October 2026

Live map
Headcode: 5C82Headcode5C82 OperatorNorthern UIDP29109

Planned service information

Power type
Diesel multiple unit
Timing load / planned train type
E
Maximum speed
90 mph
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Barrow-in-Furness112:09 11:55 -14 min
Barrow C.s.12:12 11:57 -15 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.