Service timetable
21:35 London Gateway GB Railfreight to Doncaster Iport GB Railfreight
Friday 9 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1600
- Maximum speed
- 75 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| London Gateway GB Railfreight | 21:35 | 21:26 | -9 min | |||
| London Gateway Dep Line | 21:38 | 21:40 | 21:29 | 21:40 | On time | |
| Thames Haven Sig Ur882 | 21:47 | 21:47 | 21:38 | 21:47 | On time | |
| Lea Junction | 22:36 | 22:49 | 22:37 | 22:49 | On time | |
| Finsbury Park | 8 | 23:03½ | 23:05½ | 23:06 | 23:06 | +1 min |
| Peterborough | 4 | 00:47 | 00:50 | 00:52 | 00:56 | +6 min |
| Doncaster Dn Decoy Rec5/Br | 02:46 | 03:06 | 02:28 | 03:06 | On time | |
| Doncaster Iport GB Railfreight | 03:13 | 03:09 | -4 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.