Service timetable
22:37 Norwich to Norwich C.pt. T.&R.s.m.d
Saturday 10 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 745
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Norwich | 4 | 22:37 | 22:37 | On time | ||
| Norwich C.pt. T.&R.s.m.d | 22:55 | 22:55 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.