Service timetable
03:58 Cardiff Docks Rp GB Railfreight to Gloucester N.y. GB Railfreight
Saturday 10 October 2026
Cancelled This service has been reported as cancelled.
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 600
- Maximum speed
- 75 mph
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Cardiff Docks Rp GB Railfreight | 03:58 | |||||
| Cardiff Tidal Tc GB Railfreight | 04:28 | 04:30 | ||||
| Pengam Reception Sidings GB Railfreight | 04:45 | 04:47 | ||||
| Pilning | 1 | 05:29½ | 05:38 | |||
| Gloucester N.y. GB Railfreight | 06:23 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.