Service timetable
00:20 Southampton M.c.t. to London Gateway Frghtliner
Saturday 10 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1475
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Southampton M.c.t. | 00:20 | |||||
| Eastleigh | 1 | 00:42 | 00:46 | |||
| Reading | 7 | 01:49 | 01:52 | |||
| Acton Main Line | UGL | 02:34 | 03:11 | |||
| Grays | 2 | 04:17 | 04:19 | |||
| London Gateway Port Lg11 | 04:36½ | 04:38½ | ||||
| London Gateway Arrival | 04:41½ | 04:43½ | ||||
| London Gateway Frghtliner | 04:47 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.