Service timetable
06:25 Harringay Up Rev Sidings to Royston (Herts) Loop
Saturday 10 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 715
- Maximum speed
- 60 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Harringay Up Rev Sidings | 06:25 | |||||
| Hitchin Signal Yb2536 | 07:11 | 07:15 | ||||
| Hitchin Down Yard | 07:18 | 07:32 | ||||
| Biggleswade | 4 | 07:46 | 07:49 | |||
| Langley Sth Junction | 08:08 | 08:21 | ||||
| Royston (Herts) Loop | 08:49 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.