Service timetable
11:44 W. Drayton Hanson Agg Flhh to Dagenham Dock A.r.c.
Saturday 10 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 600
- Maximum speed
- 60 mph
- Operating characteristics
- Q
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| W. Drayton Hanson Agg Flhh | 11:44 | |||||
| Acton Main Line | UGL | 12:02 | 12:35½ | |||
| Willesden Junction High Level | 4 | 12:44 | 12:46 | |||
| South Tottenham | 2 | 13:14 | 13:16 | |||
| Ripple Lane Signal 807 | 13:43½ | 13:47½ | ||||
| Dagenham Dock A.r.c. | 14:09 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.