Service timetable
00:35 London Gateway Db Cargo to East Mids Gateway Terminal Dbc
Saturday 10 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1600
- Maximum speed
- 75 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| London Gateway Db Cargo | 00:35 | |||||
| London Gateway Dep Line | 00:38 | 00:40 | ||||
| Thames Haven Sig Ur882 | 00:47 | 00:47 | ||||
| Finsbury Park Sig K381 | 01:58½ | 02:04 | ||||
| Finsbury Park | 8 | 02:05½ | 02:07½ | |||
| Huntingdon | 3 | 03:46 | 03:47 | |||
| Peterborough | 4 | 04:13½ | 04:17½ | |||
| Castle Donington Emdc | 06:02½ | 06:37 | ||||
| East Mids Gateway Arrival | 06:44 | 06:46 | ||||
| East Mids Gateway Terminal Dbc | 06:56 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.