Detailed timetable
21:25 Epsom to Epsom - Down Sidings
Sunday 11 October 2026
Planned service information
- Power type
- Electric multiple unit
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Epsom | 1 | 21:25 | 21:25 | On time | ||
| Epsom - Down Sidings | SDG | 21:27 | 21:26 | -1 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.