Detailed timetable
15:22 Colchester Up Passngr Loop to Ipswich
Sunday 11 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 755
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Colchester Up Passngr Loop | 15:22 | 15:22 | On time | |||
| Colchester | 3 | 15:24 | 15:25 | 15:24 | 15:25 | |
| Manningtree | 3 | pass | 15:32½ | 15:32½ | ||
| Ipswich Halifax Junction | pass | 15:39 | 15:39 | |||
| Ipswich | 3A | 15:41 | 15:41 | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.