Detailed timetable
20:35 Ipswich to Colchester Up Passngr Loop
Sunday 11 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 755
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Ipswich | 1 | 20:35 | 20:34 | -1 min | ||
| Ipswich Down And Up Goods | 20:37 | 20:44 | 20:36 | 20:43 | -1 min | |
| Ipswich | 2 | pass | 20:46 | 20:45 | -1 min | |
| Ipswich Halifax Junction | pass | 20:47½ | 20:46 | -1 min | ||
| Manningtree | 2 | pass | 20:55½ | 20:54 | -1 min | |
| Colchester | 3 | 21:03½ | 21:04½ | 21:02 | 21:04 | On time |
| Colchester Up Passngr Loop | 21:06½ | 21:06½ | On time | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.