Service timetable
13:25 Warminster to Warminster
Sunday 11 October 2026
Planned service information
- Power type
- Diesel multiple unit
- Timing load / planned train type
- E
- Maximum speed
- 90 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Warminster | 2 | 13:25 | 13:25 | On time | ||
| Warminster Signal W753 | 13:26 | 13:29 | 13:26 | 13:29 | ||
| Warminster | 1 | 13:30 | 13:30 | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.