Detailed timetable
20:36 Cheltenham Spa to Cheltenham Spa
Monday 12 October 2026
Planned service information
- Power type
- Diesel multiple unit
- Timing load / planned train type
- 802
- Maximum speed
- 125 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Cheltenham Spa | 2 | 20:36 | ||||
| Alstone C. Sidings | 20:38 | 20:58 | ||||
| Cheltenham Spa | 1 | 21:00 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.