Service timetable
14:10 Doncaster Iport GB Railfreight to London Gateway GB Railfreight
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1475
- Maximum speed
- 75 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Doncaster Iport GB Railfreight | 14:10 | 13:22 | -48 min | |||
| Doncaster Dn Decoy Rec5/Br | 14:18 | 14:45½ | 13:32 | 14:45½ | On time | |
| Werrington Junction | 16:39½ | 16:50 | 16:26½ | 16:28 | -22 min | |
| Peterborough North Yard GB Railfreight | 16:58 | 18:48 | 16:36 | 19:51 | +63 min | |
| Peterborough | 1 | 18:53 | 18:55 | 19:56 | 19:56 | +61 min |
| Conington Loop | 19:10½ | 19:46 | 20:10½ | 20:46 | +60 min | |
| Alexandra Palace | 1 | 21:20 | 21:22 | 21:34 | 21:36 | +14 min |
| Canonbury West Junction | 21:31 | 21:57½ | 21:47 | 21:58 | +1 min | |
| Stratford Signal L295 | 22:14½ | 22:14½ | 22:14½ | 22:13 | -1 min | |
| Barking | 7 | 22:29 | 22:29½ | 22:35 | 22:38 | +9 min |
| Ripple Lane Signal 813 | 22:41 | 22:50 | 22:52 | 23:01 | +11 min | |
| London Gateway Port Lg11 | 23:23½ | 23:30 | 23:40 | 23:42 | +12 min | |
| London Gateway Arrival | 23:33 | 23:35 | 23:45 | 23:47 | +12 min | |
| London Gateway GB Railfreight | 23:38 | 23:50 | +12 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.