Detailed timetable
21:00 Bristol East Depot to Westbury Up Trowbridge Siding
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 600
- Maximum speed
- 75 mph
- Operating characteristics
- Q
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Bristol East Depot | 21:00 | |||||
| Bristol East Depot Dgl | 21:30 | 21:43 | ||||
| Bath Spa | 2 | pass | 21:55 | |||
| Bathampton Junction | pass | 21:59½ | ||||
| Bathampton Sig Bl1990 | pass | 22:04 | ||||
| Bradford-on-Avon | pass | 22:07½ | ||||
| Bradford Junction | pass | 22:10½ | ||||
| Hawkeridge Junction | pass | 22:18 | ||||
| Westbury (Wilts) | UR | 22:20 | 22:25 | |||
| Westbury Up Trowbridge Siding | 22:30 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.