Service timetable
11:15 London Gateway Frghtliner to Widnes Freight Terminal Fl
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1475
- Maximum speed
- 75 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| London Gateway Frghtliner | 11:15 | |||||
| London Gateway Dep Line | 11:18 | 11:20½ | ||||
| Thames Haven Sig Ur882 | 11:27½ | 11:30 | ||||
| Gospel Oak Sig Nl 1306 | 12:32 | 12:34 | ||||
| Willesden Up & Down Relief | URL | 13:07½ | 13:31½ | |||
| Rugby | 2 | 15:16½ | 15:18½ | |||
| Nuneaton | 2 | 15:35 | 15:37 | |||
| Crewe Sig. Il3017/5021 | DSI | 16:56 | 16:58 | |||
| Ditton Reception Sidings | 17:40½ | 17:44½ | ||||
| Widnes Freight Terminal Fl | 17:50 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.