Service timetable
07:40 Royston (Herts) Loop to Harringay Up Rev Sidings
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 715
- Maximum speed
- 60 mph
- Operating characteristics
- Q
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Royston (Herts) Loop | 07:40 | 07:40 | On time | |||
| Hitchin | 1 | 07:59 | 08:01 | 08:03 | 08:03 | +2 min |
| Alexandra Palace | 1 | 08:56 | 08:56½ | 08:55 | 08:55 | -1 min |
| Harringay Up Rev Sidings | 09:02 | 09:01 | -1 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.