Service timetable
03:39 Wembley Receptions 1-7 to East Mids Gateway Terminal GB Railfreight
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1600
- Maximum speed
- 75 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Wembley Receptions 1-7 | 5 | 03:39 | 04:03 | +24 min | ||
| Rugby | 1 | 05:33 | 05:38½ | 05:39 | 05:40 | +2 min |
| Aston Signal Sb4619 | 06:22 | 06:25 | 06:37 | 06:40 | +15 min | |
| Water Orton West Junction | 07:09 | 07:20 | 07:24 | 07:35 | +15 min | |
| East Mids Gateway Arrival | 08:21½ | 08:23½ | 08:14½ | 08:23½ | On time | |
| East Mids Gateway Terminal GB Railfreight | 08:34 | 08:27 | -7 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.