Service timetable
09:11 Wellingborough Up Tc GB Railfreight to Tunstead Sidings GB Railfreight
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 600
- Maximum speed
- 75 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Wellingborough Up Tc GB Railfreight | 09:11 | 09:07 | -4 min | |||
| Wellingborough Sig Bk6065 | 09:23 | 09:25 | 09:19 | 09:22 | -3 min | |
| Whitacre Down Arley Loop | 10:33 | 11:35½ | 10:33 | 11:35½ | On time | |
| Coleshill Parkway | 1 | 11:40½ | 11:42½ | 11:40½ | 11:42½ | |
| Water Orton | DW | 11:46 | 11:46½ | 11:46 | 11:46½ | |
| Bushbury Junction D G L | 12:30 | 12:42½ | 12:30 | 12:42½ | ||
| Crewe | 1 | 13:27 | 13:33 | 13:27 | 13:33 | |
| Guide Bridge Up & Down Pl | 14:20 | 14:45½ | 14:20 | 14:45½ | ||
| Chinley Signal Cy168 | 15:24 | 15:26 | 15:24 | 15:26 | ||
| Great Rocks Junction | 15:35 | 15:35 | 15:35 | 15:35 | ||
| Tunstead Sidings GB Railfreight | 15:42 | 15:42 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.