Service timetable
14:26 Hanwell Bridge Loop to Dagenham Dock A.r.c.
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 2400
- Maximum speed
- 60 mph
- Operating characteristics
- QY
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Hanwell Bridge Loop | DGL | 14:26 | 14:28 | +2 min | ||
| Acton Main Line | UGL | 14:36½ | 14:40½ | 14:36 | 14:40 | On time |
| Ripple Lane Signal 807 | 15:39 | 15:41 | 15:50 | 15:48 | +7 min | |
| Dagenham Dock A.r.c. | 16:03 | 16:06 | +3 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.