Service timetable
01:02 Barrow Hill Up Sidings No 2-3 to Tunstead Sidings (Fhh)
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 600
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Barrow Hill Up Sidings No 2-3 | 01:02 | |||||
| Sheffield | 6 | 01:28½ | 01:36½ | |||
| Great Rocks Junction | 02:23 | 02:25 | ||||
| Tunstead Sidings (Fhh) | 02:31 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.