Detailed timetable
13:45 Chichester Recp. (Flhh) to Merehead Quarry (Fhh)
Monday 12 October 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 600
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Chichester Recp. (Flhh) | 13:45 | |||||
| Chichester | 2 | 13:48½ | 13:50½ | |||
| Emsworth | pass | 13:59½ | ||||
| Havant | 2 | pass | 14:04½ | |||
| Farlington Junction | pass | 14:10 | ||||
| Cosham Junction | pass | 14:17½ | ||||
| Cosham | pass | 14:18½ | ||||
| Fareham | 1 | pass | 14:28 | |||
| Swanwick | pass | 14:33½ | ||||
| Hamble | pass | 14:41½ | ||||
| Sholing | pass | 14:45½ | ||||
| St Denys | pass | 14:51 | ||||
| Northam Junction | pass | 14:56½ | ||||
| Southampton Central | 4 | pass | 14:59½ | |||
| Southampton Down Loop | 15:01½ | 15:27 | ||||
| Church Lane Junction | pass | 15:29 | ||||
| Redbridge (Hants) | pass | 15:31 | ||||
| Romsey | 2 | pass | 15:45½ | |||
| Dean | pass | 15:55½ | ||||
| Tunnel Junction | pass | 16:08 | ||||
| Salisbury | 4 | pass | 16:12½ | |||
| Wilton Junction | pass | 16:18 | ||||
| Wishford | pass | 16:26 | ||||
| Wylye Ahb | pass | 16:32 | ||||
| Upton Lovell | pass | 16:38 | ||||
| Warminster Signal W301 | pass | 16:43 | ||||
| Warminster | 1 | pass | 16:44½ | |||
| Westbury Signal W305 | pass | 16:50 | ||||
| Westbury (Wilts) | DR | 16:52 | 17:22 | |||
| Fairwood Junction | pass | 17:24½ | ||||
| Clink Road Junction | pass | 17:28 | ||||
| Blatchbridge Junction | pass | 17:30 | ||||
| East Somerset Junction | UGL | pass | 17:36 | |||
| Merehead Quarry Junction | pass | 17:45 | ||||
| Merehead Quarry (Fhh) | 17:55 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.