Service timetable
23:28 Skipton Broughton Rd C.s. to Skipton Down Stabling Siding
Monday 12 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 333
- Maximum speed
- 100 mph
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Skipton Broughton Rd C.s. | 23:28 | 23:28 | On time | |||
| Skipton | 2 | 23:33 | 23:34 | 23:33 | 23:34 | |
| Skipton Sth Junction Sig L4549 | 23:36 | 23:39 | 23:36 | 23:39 | ||
| Skipton | 4 | 23:41 | 23:44 | 23:41 | 23:44 | |
| Skipton Down Stabling Siding | 23:46 | 23:46 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.