Service timetable
21:31 Leeds to Doncaster Carr Iep Depot
Monday 12 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 800
- Maximum speed
- 125 mph
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Leeds | 11D | 21:31 | 21:31 | On time | ||
| Wakefield Westgate | 1 | 21:47 | 21:51½ | 21:45 | 21:51½ | On time |
| Doncaster | 1 | 22:12 | 22:15 | 22:08 | 22:08 | -7 min |
| Doncaster Carr Iep Depot | 22:20 | 22:11 | -9 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.