Service timetable

03:19 Drax Aes (GB Railfreight) to Liverpool Biomass Terminal Gbf

Tuesday 13 October 2026

Live map
Headcode: 6M08Headcode6M08 UIDH49844
Cancelled This service has been reported as cancelled.

Planned service information

Power type
Diesel
Timing load / planned train type
800
Maximum speed
60 mph
Operating characteristics
Y
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Drax Aes (GB Railfreight)03:19 04:13 +54 min
Wakefield Kirkgate304:0304:05½ 04:56 04:58½ +53 min
Edge Lane Junction06:0806:11 06:42 06:41 +30 min
Bootle Junction Stop Board06:29½06:31½ 08:31½ 08:33½ +122 min
Strand Road Level Crossing06:3606:38 08:38 08:40
Liverpool Biomass Terminal Gbf06:48 08:43 +115 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.