Detailed timetable
07:44 Bedford Cauldwell Depot to Bedford
Sunday 18 October 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Bedford Cauldwell Depot | 07:44 | 07:40 | -4 min | |||
| West Hampstead Signal 601 | 07:49 | 07:59 | 07:45 | 07:47 | -12 min | |
| Bedford | 1 | 08:02 | 07:50 | -12 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.